
PLMT
Test benches and calibration systems

Sensor calibration workstations
The AFCU-360M is a function control unit for the daily checks of immission analysers in ambient air monitoring stations. It generates zero gas and span gas concentrations for the periodical function control of the analysers and is referenced to EN 14211. Its fields of use are air quality monitoring, immission measuring stations and ambient air monitoring.
To prepare fixed span gas concentrations, the unit uses dilution, permeation, UV irradiation or gas phase titration, depending on the configuration. Thermal mass flow controllers adjust the individual flow rates of zero air and span gas; flow control is by analogue mass flow controllers. Up to five channels can be operated in serial operation, and the modular layout allows the unit to be upgraded later.
Repeatability is ±2.5 % of set point. The permeation system is thermostatted at 50 °C with an accuracy of ±0.1 °C, and the UV ozone generator at 70 °C with ±0.1 °C.
Optional modules include a permeation system for NO₂, SO₂, NH₃, H₂S and BTX, an ozone generator using UV radiation, dilution with or without cylinder purge flow, and gas phase titration. Media handled are zero air, span gas and the permeation components listed.
The function check can be started manually with a rotary switch or externally from the analyser via a contact signal at 24 VDC, so it can be integrated into the station's automatic test sequence.
The unit is built in a 19 in rack housing of 3 HE height and 570 mm depth and is powered from 230 VAC, 50 Hz. It conforms to RoHS, REACH and EMC requirements. It should be installed in a well-ventilated area without strong vibrations at a room temperature between 5 and 35 °C.
When enquiring, please specify the analysers to be checked, the gas components and concentrations required, the number of channels and the gas preparation methods (dilution, permeation, ozone or gas phase titration) needed.
Identify the unit under test, the reference instruments, the load range and the data the report must contain. A drawing of the fixture and the required test cycle help distinguish a complete bench from a replacement measuring channel.
For an installed instrument, copy the complete ordering code and its suffixes from the nameplate. Identify the part that will remain in service and the part that needs to be replaced. A photograph of the connection face or terminal markings helps resolve differences between versions that share the same housing.
For a new installation, describe what the instrument must measure or control and where the reading will be used. Give the normal operating conditions separately from short peaks. Include units with every numerical value. A drawing with the available space, orientation and access for removal gives the supplier a practical starting point.
Add the quantity for each position and identify any accessories that belong with it. Where a particular drawing, material certificate or calibration record is required, mention it with the line item. Submit the list with the destination country so that the response can cover the requested configuration and delivery.