
PLMT
Test benches and calibration systems
Identify the unit under test, the reference instruments, the load range and the data the report must contain. A drawing of the fixture and the required test cycle help distinguish a complete bench from a replacement measuring channel.
Raw-water intake, aeration basins and final effluent each need a different sensor installation. State the water source, solids content and access for cleaning the probe.
Identify the unit under test, the reference instruments, the load range and the data the report must contain. A drawing of the fixture and the required test cycle help distinguish a complete bench from a replacement measuring channel.
For a new installation, describe what the instrument must measure or control and where the reading will be used. Give the normal operating conditions separately from short peaks. Include units with every numerical value. A drawing with the available space, orientation and access for removal gives the supplier a practical starting point.
Add the quantity for each position and identify any accessories that belong with it. Where a particular drawing, material certificate or calibration record is required, mention it with the line item. Submit the list with the destination country so that the response can cover the requested configuration and delivery.