
Type 8203
Liquid analysis

Water quality analysers
The CS-1000 is an all-in-one chemical solution monitoring system for semiconductor manufacturing, designed specifically for back-end-of-line (BEOL) wiring formation processes. It monitors multi-component chemical solutions and is consolidated in an independent cabinet that is installed at the manufacturing site.
Three measuring principles are combined in the system: absorption spectroscopy for chemical concentration, a 2-electrode method for conductivity and a glass electrode for pH. With these, the CS-1000 detects low-concentration components at ppm level in multi-component solutions without sample pretreatment, and measures concentration, conductivity and pH simultaneously.
The system has two separate sample flow lines, so two different chemical solutions can be measured at the same time. An automatic calibration function is provided for the pH meter. Maintenance is limited to about four hours every six months.
Results are output as hardwired 4–20 mA analogue signals, over RS-485 with Modbus RTU and via parallel I/O for integration into the fab's control systems.
The system is powered from 190–240 VAC single-phase at 50/60 Hz and consumes approximately 355 VA. The cabinet measures 700 × 610 × 1640 mm (W × D × H) and weighs approximately 200 kg. Materials in contact with the chemicals include PFA, PTFE, quartz, Kalrez, carbon, PVC, ETFE, PEEK, olefinic resin, THV and PharMed BPT. The specified ambient humidity range is 40 to 70 % RH.
The CS-1000 is SEMI S2 certified and carries CE, KC and UKCA marking; it conforms to FCC Rules Part 15 and to RoHS and REACH.
The typical application named for the system is the monitoring of chemical solutions in semiconductor manufacturing processes, in particular in BEOL wiring formation, where low-concentration components in the solution have to be tracked continuously.
When enquiring, please describe the chemical solutions to be monitored, the components and concentration ranges of interest, the number of sample lines and the required communication interface.
Record the sample temperature, expected concentration and how the probe is mounted. Identify the mating transmitter when replacing a sensor.
For an installed instrument, copy the complete ordering code and its suffixes from the nameplate. Identify the part that will remain in service and the part that needs to be replaced. A photograph of the connection face or terminal markings helps resolve differences between versions that share the same housing.
For a new installation, describe what the instrument must measure or control and where the reading will be used. Give the normal operating conditions separately from short peaks. Include units with every numerical value. A drawing with the available space, orientation and access for removal gives the supplier a practical starting point.
Add the quantity for each position and identify any accessories that belong with it. Where a particular drawing, material certificate or calibration record is required, mention it with the line item. Submit the list with the destination country so that the response can cover the requested configuration and delivery.